Meantime Brewing Company Project Management and Installation Services

Meantime.png

Ambro was contracted by Meantime to provide project management and installation services for the DAL plant supplied by DENWEL.

Meantime's site has grown organically and at that point in time, a full set of plant P&IDs was in the process of being updated. Hobbs Scott engineers attended site to survey, produce detailed P&IDs and decide upon the best options for location and integration into existing pipework. An additional consideration was the age and structure of the building, which includes roofing that must not be altered. Ambro and DENWEL met with the Head Brewer, and the best location was determined, together with a finalised P&ID. 

The project was completed and commissioned in April 2018. 